The wind farm Ponikve is located on the Pelješac peninsula and it is the first wind farm developed in Dubrovnik-Neretva County. Construction of the plant began in 2011 and was put into operation in 2013. The total installed capacity of the project is 36.8 MW divided into 16 Enercon E-70 wind turbines with an individual rated power of 2.3 MW. The power plant annually produces about 65 GWh of clean electricity.

| Number of installations: | 16 |
| Type: | Enercon E-70 |
| Investment amount: | 46.000.000 € |
| Rated power: | 36.80 MW |
| Commissioning: | 2012 |
| Annual production: | 65 GWh |
| Corresponds to annual consumption: | more than 70.000,00 € |
| Location: | Dubrovnik-Neretva County |